#EastFaceHousePlan #2bhk #Estimation #Tamil
EAST FACE HOUSE PLAN 2BHK 35’*43’
Total Construction Area =1000 sqft
Total Construction Cost =17 lakhs
#hall -11’3”*15’6”
#kitchen -10’9”*8’
#masterbedroom -10’*11’
#bedroom - 10’*11’
#toilet -4'*7'
#carparking -13’6”*11’
#toilet -4’*7’
************************************
Credence Construction
Specification of Building
Foundation
As per drawing isolated footing.
• R.C.C. footing as per drawing.
• R.C.C. plinth beam at existing ground level as per drawing.
• Basement height 3’0” from the natural ground level of the plot.
• Pest control for foundation and basement.
Structure
• Roof height 10’0” from the basement.
• Brick work super structure – outer wall 9” thick and inter partition 4 ½” wall thick.
• Terrace parapet wall3’0” from last roof level at 41/2” brick work.
• R.C.C. loft 2’0” width 1 for all bedrooms one side of the wall except living dinning & toilet.
Plastering
• Inner wall plastering smooth finish (C.M1:5)
• Ceiling plastering sponge rough finish (C.M 1:3)
• Outer wall plastering sponge finish (C.M 1:5)
Joineries
• Main door frame teak wood frame at the size of 5” X 3”.
• Other door frames teak wood frame at the size of 4” X 2½”.
• Main door shutter is designed solid wood panel door at 30mm thick.
At the cost of overall 25,000/-.
• Other door shutters are designed molded skin door at 30 mm thick.
At the cost of overall 10,000/-.
• Toilet door are PVC DOORS. At the cost of overall 3500/-.
Windows
• All window frame and shutter are in wood.
• All toilet ventilator louver with exhaust type.
Grills
• All window grills are in 10mm square rod with 1.5 kgs per sqft.
• Staircase are fitted with S.S hand rails regular model.
Plumbing
• Concealed water line pipes are C.P.V.C pipes.( Ashirvad pipe).
• Outer water line pipes are blue P.V.C pipes ( True bore pipe ).
• In outer necessary inspection chamber with R.C.C cover.
• C.P fitting are jaguar basic model.
• All toilet 2 in 1 wall mixer with shower, E.W.C ( or) I. W. C sanitary fittings are parry ware (or) Hind ware regular model.
Painting
• Ceiling are one coat of primer and two coat of ACE emulation paint.
• Inner walls were Birla putty finish with one coat of primer and Asian ACE emulation 1 coat.
• Other doors are enamel paint one coat of primer, patty and two coat of color.
• Outer walls were one coat of primer and two coat of Asian ACE emulation 1 coat.
Tiles
• 2’0” X2’0” vitrified tile ( rate Rs 45/- sqft.) with height 4” skirting.
• Toilet wall tile 12’ X8” at 7’0” height ( rate - 40/-).
• 1’ X 1’ anti skid floor tile match wall tile. ( rate - 40/-).
• Kitchen wall tile 12’ X8” at 2’0” height ( rate - 40/-).
• Steps tile flooring at the rate of 40/-.
Kitchen
• Kitchen top G. 20 black granite at required basis.
• S.S sink at size 36” X 18” with bowl and drain board with one swan neck tap.
Electrical
• All electrical cables are I.S.I cables like orbit (or) polycab.
• Electrical switches are anchor roma.
• Three phase electrical wiring with necessary M.C.B with D.B work.
• Basic electrical points will be provided as per the drawing.
• Invertors provision as per the required basic.
Note:-
Material escalation maximum rate .
coramandal cement Rs 380/- per bag,
a. M.Sand Rs 60/-per cft,
b. ¾ Blue metal Rs 36/- per cft,
c. Steel isteel (or) ARS Rs 56/- per kg,
d. brick Rs 5.5/- per nos,
• Area reduction should not take place after the area and rate finalized.
• E .B & water source should provide by the client.
• All Construction activates using approved M.Sand.
Item comes under additional charges.
• U.G sump & over head tank.
• Terrace weathering course tile.
• Building outer sed back work.
• Front compound wall & gate.
• Elevation features .
• Architectural design charges .
• Structural design charges.
• Approval charges.
• Soil testing charges .